What is a change order? If you’ve ever gone through a remodel, or you’re about to start one, you’ve probably heard those two words said in a way that makes your stomach drop a little. It usually means more money, more time, and a conversation nobody wanted to have. You didn’t budget for it. You didn’t plan for it. And now you’re stuck deciding whether to pay up or live with something you don’t actually want in your own home.
I want to walk you through what a change order actually is, why they happen even with good, honest contractors, and why our process has gotten us down to just one in the last fifty projects.
What a change order actually is
A change order isn’t a scam, and it isn’t automatically a red flag. In plain terms, it’s a small, separate agreement that both you and your contractor sign when something about the original plan needs to change, whether that’s the scope of work, the materials, or the price. It exists because no contractor has a crystal ball. Nobody can see inside your walls before we open them, and nobody can predict every decision you’ll make once you see your new space taking shape.
Here’s something most homeowners don’t know: a change order doesn’t always mean you owe more money. Sometimes it works the other way, the contractor owes you money back. Instead of rewriting the entire original contract every time something shifts, a change order just documents what changed, why, and what it costs, so both sides are protected and nobody’s guessing.
What happens when nobody planned for the unknown
Years ago, before I ran my own company, I worked a project on a very old home. Whoever owned it before had clearly had work done by several different people over the years, none of it well coordinated. Every time we opened a wall, we found something new. Different types of water pipe spliced together. Electrical that didn’t run where it was supposed to. No insulation at all in sections where there should have been. Every one of those discoveries meant a change order, not because anyone was trying to pad the bill, but because nobody, including us, could have known what was back there until we saw it.
That’s the legitimate side of change orders. The other side, the one that actually damages trust, is when a contractor could have caught something ahead of time and just didn’t bother to look.
How we try to get ahead of it before it happens
When we meet a client for the first time, we walk the home together. Years of opening up walls gives us a pretty educated guess about what we’re likely to find based on the home’s age and history, but a guess is still a guess. So we have an honest conversation right up front. We tell them plainly that once we’re inside the walls, we might find something that changes the number we just gave them, and we ask if they’re comfortable with us calling a timeout to talk it through before we do anything. We also ask them to call that same timeout on us, if they ever see something during construction that doesn’t sit right with them. Setting that expectation early means that if the moment actually comes, it isn’t awkward or tense. Everyone already agreed on how we’d handle it.
Then comes the design phase, which is where most potential change orders actually get caught before they ever become real. We start by listening, really listening, to what a client wants, before we tell them anything. Then we scan the space to get an accurate floor plan and build it out in design software, where we can adjust everything from wall colors to finish materials so the client can actually see what they’re getting. This step catches problems early. We’ve found drain slopes that wouldn’t allow a sink to move where someone wanted it, layouts that looked fine on paper but didn’t leave enough real space, and other issues that would have become expensive surprises mid-construction. Working through those problems on a screen, instead of after concrete has already been cut, is the whole point.
What happens if you change your mind mid-project
I’ll be honest with you, because this part isn’t always easy to hear. Once materials are installed, they’re yours. If you decide midway through that you don’t like the tile, or the cabinets come in darker than you pictured, that’s a genuine change order, and it’s not something either of us can just undo for free. Some materials can be returned before they’re installed, and a few even after, if they’re still in good shape. But tile that’s already laid, or semi-custom cabinets that have already been built, can’t just go back on a truck.
This is exactly why the rendering process matters so much. We had a client who wanted her bathtub positioned a certain way. Once we built it into the design program, she could see how much space she’d actually lose with that placement. We worked through it together right there, moved the layout, and found a spot that gave her both the tub she wanted and the space she needed. If we’d discovered that during construction instead, she would have been stuck either paying more to fix it or living with a room that felt cramped, and neither of us would have walked away happy. Catching it on screen made it a win for both of us instead.
Why doesn’t every contractor do this
Some contractors are just starting out and haven’t had the chance to build a process like this yet. I hadn’t, either, when I first started. I’d take a job, start building, run into something I didn’t account for, and have to go ask the client for more money mid-project. Most of them understood. But I hated putting them in that position, and I hated being caught off guard myself.
Other contractors are simply moving fast, trying to get a number out the door and get to work, without walking through everything that actually goes into a bathroom or kitchen. And I’ll be honest about something uncomfortable too: I do think there are contractors out there who bid a job low on purpose, knowing full well they’ll make the real money back through change orders once you’re already committed.
Here’s the real trade-off with our approach. It takes longer upfront. Where another contractor might hand you a number within a week, our process, the walk through, the design, the rendering, can take a month or two before we give you a final number. But once that number is final, it stays final. If I made a mistake in my planning, that’s on me, and I eat the cost.
The payoff is that once construction actually starts, everything moves faster and smoother, because we’re not waiting around mid-project for decisions to get made or materials to get ordered. We already know exactly what we’re using and when it’ll arrive.
The number that convinced me this actually works
When I started this business, I assumed a change order on almost every job was just part of the deal. I didn’t even talk about it with clients, partly because I was afraid it would scare them off, and partly because I genuinely didn’t know any better yet.
Today, my goal on every project is zero change orders on our end. I won’t pretend that’s realistic every single time, sometimes a 3D rendering still can’t fully capture what a space feels like in real life, and a client changes their mind anyway. But out of our last fifty projects, we’ve had exactly one change order. Not one type of change order. One, total.
And even that one wasn’t a structural surprise we missed. It was a client who changed her tile selection before we laid it, swapped out a door we realized wouldn’t actually work for a different one, and added under-cabinet lighting late in the project after going back and forth on it for a while. Every bit of that came from her changing her mind, not from something we failed to catch.
That’s not typical for this industry. Construction management data from CoConstruct shows projects between $250,000 and $500,000 average 6.3 change orders each, on a single job, not once across fifty of them.
The misconception worth clearing up
I don’t think most homeowners actually understand what a change order is supposed to be. Most people assume it only happens because of something unpredictable behind a wall, or because they changed their mind. What they don’t picture is a contractor and homeowner both genuinely believing something would work, discovering mid-project that it won’t, and ending up like two people standing in a room pointing fingers at each other, both convinced it’s the other one’s fault.
What to ask before you sign anything
If you’re mid-remodel right now and just got hit with a surprise change order, or you’re about to start one, here’s my honest advice: ask your contractor directly about their change order process before you sign anything. Ask what they expect might come up once they’ve actually walked your home. Any contractor who’s confident in their process will be glad to walk you through it. Someone who’s less experienced, or just doesn’t want to slow down to think it through, will wave the question off with something like “don’t worry, I’ve done this a hundred times, it’ll be fine.” I’ll be honest, that phrase makes me nervous every time I hear it from someone else, because it usually means nobody actually looked closely enough to know.
A real answer sounds like a plan. A brush-off sounds like a hope.
If you want somewhere to start, here are three questions worth copying into an email to any contractor you’re considering:
- How do you handle unexpected issues found behind the walls once construction starts?
- What does your design and rendering process look like before construction begins?
- Once you give me a final number, what actually changes it after that, besides me changing my mind?
A contractor who’s done this before will answer all three without blinking.
If you’re staring down a change order right now, or you just want to understand what you’re actually getting into before you sign with anyone, reach out and let’s talk it through. I’ll walk you through exactly what our process looks like and why it’s gotten us to one change order in fifty projects, so you know what to expect before you’re standing in the middle of a job wondering what happened.
Ready to plan a remodel that stays on budget from day one? Schedule a consultation with Stoney Hill Construction and let’s map out your project before a single wall comes down.